CLIENT
Managed by Body Corporate Services
Carpark
2 Jones Bay Road
Pyrmont NSW
![LED Lighting Undercover Carpark - 2 Jones Bay Road Pyrmont](https://eolighting.com.au/wp-content/uploads/2017/04/Site-of-2-Jones-Bay-Road-Pyrmont.jpg)
SCOPE
Our client brief was to supply and install LED lighting to the busy multi-level undercover carpark, which is managed by BCS Strata Management, located at the basement of a large residential apartment block at 2 Jones Bay Road, Pyrmont.
We replaced all metal halide lamps and 36 watt fluorescent tubes with our energy saving LED weatherproof battens, which were both sensored and emergency in the carpark and firestairs, LED downlights outside the lift areas and our LED floodlights in the entrance to the driveway.
Over 530 existing lights were replaced.
BEFORE LED UPGRADE
Existing Consumption 199,364 kW pa
Existing Energy Cost $45,853 pa
![LED Lighting Fire Stairs in Undercover Carpark](https://eolighting.com.au/wp-content/uploads/2017/04/LED-lighting-in-undercover-carpark-2.jpg)
![LED lighting in fire stairs of undercover carpark](https://eolighting.com.au/wp-content/uploads/2017/04/Fire-Stairs-1x18W-EM-SD-3.jpg)
RESULTS
AFTER LED UPGRADE
Upgrade Consumption 67,332 kW pa
Upgrade Energy Cost $15,486 pa
SAVINGS
Annual kW Saving 132,032 kW
Annual Cost Saving $30,367
Maintenance Savings $5,840 pa
Annual Carbon Saving 139,954 kgs
Energy Savings 66%
LED PROJECT COSTS
Upgrade Cost $107,208
Net ESS Credit $41,888
Net Cost $65,320
ROI (payback period) 1.6 years
![LED lighting in carpark at 2 Jones Bay Road, Pyrmont](https://eolighting.com.au/wp-content/uploads/2017/04/Lift-area-with-LED-lighting.jpg)